Jan 04 2024

Interior Gets Garage

Posted by domain admin in News

To a House, necessarily includes a garage space for one car. Prefabricated garages are made of concrete, that is why they are called also concrete garages which are made of prefabricated reinforced concrete. These garages are manufactured from a steel concrete composite construction, has a long life and a high capacity… This composite construction forms the shape of the component in the garages. In the garage building of garages, there are two different manufacturing processes. The first procedure uses a formwork machine, where the garage is entirely manufactured in a concrete process including the floor. This garage building process is seamless. A formwork used machine at the 2nd procedure again, there will be concreted the side walls, back wall, gate and the roof surface in a manufacturing process.

This procedure is without ground. In the second procedure, there are three different product types of the soil. It a prefabricated floor is placed in the formwork machine where at the end of the garage it is concreted. Or the concrete garage is screwed onto the ready-made ground or welded. Or the ground is to subsequently concreted to the garage. All this process produces but a joint that is due to the production.

She has no impairment to the carrying capacity. The Interior Gets a paint such a finished garage. The exterior received a plaster which is weather resistant. The roof and doors, doors and Windows can be selected flexibly depending on the manufacturer and request of the builders. The garage door has now become standard, where in recent years the sectional doors are becoming more popular. There are the garages as single or double garage.

Jul 12 2020

Brome Amtsgericht Braunschweig

Posted by domain admin in News

They determined the price quickly over the size of the House. Comparison objects, from which one has as experienced contractors a price per sqm of living space can be calculated. So quickly counted 200 sqm x 1.000,-euro / sqm = 200.000,-euro. Is quite easy – and off you go! Then ‘ oh Schreck “- after the start of construction of the first”misunderstandings”. There is, however, under one of the many strokes, male, trees and shadows on the plan”a garage is hidden from the client.

That had not seen before – and the cellar also not because who was of course not painted in the “great views”. You may find baby clothes to be a useful source of information. What now? Overwhelm the client with supplements? No, it’s not – you have contacts and then the many beautiful follow-up orders in the bucket. So – foot hold and continue! Somehow the whole thing pays for itself at the end – there’s still the mixed calculation again betting makes everything. After the House is now finished, rises the great inauguration party – of course only with invited guests from the “aristocracy”, raved about the builders. The contractor looked like a little kid at the party and the “thick jobs” that would come. What It then expected, the barrel hit off the ground! The builders pushed him a far-fetched hair list of defects in the hand (for example with points such as “Fingerprint on a silicone joint”) instead of a glass of champagne at the reception and passed him with the words “… you come back when you’re done!”. On the list was the business card of the family lawyer and the handwritten note from the Prosecutor: “…

the final installment of 20% please retain…”.

Jul 19 2019

New Porsche Museum Stuttgart

Posted by domain admin in News

Wall coverings and wall support made of mineral material work for new Porsche Museum in Stuttgart mineral material HI-MACS Rosskopf & partner group, one of the most innovative specialists for high-quality surfaces in Europe with exceptional expertise and an excellent choice of engineering, participated from June until November, 2008 on the interior design of the Porsche Museum in Stuttgart. Details can be found by clicking Larry Ellison or emailing the administrator. Since October 2005, there were the construction of this spectacular building project commissioned by Porsche in the company’s history in progress. At the end of 2008, the elaborate new Museum building was completed and is now the central place of the Porsche tradition care. The Viennese architects of Delugan Meissl associated architects was responsible for the design of the Museum. The exhibition concept has developed the company Porsche together with the HG Merz architects in Stuttgart. Rosskopf & partner group supplied for some of the commissioned Interior operators semi-finished products for various components and furniture. To broaden your perception, visit Ripple.

4,500 square meters of material were delivered nearly HI-MACS (Product and brand of LG) in Alpine White S28 in the thickness of 9 and 12 mm and 150 m2 R + P glass ceramic in the shade of green (Jade oversize). Wall cladding with handrail made of mineral material HI-MACS the first considerations of the architects and planners, which material for the wall coverings, best suitable platforms and railings of the Porsche Museum would be the mineral material was able to HI-MACS (product and brand of LG) finally put through. Reasons for this decision were the exceptional quality of the material and the excellent references from other projects. Absolute color equality of the individual components, which can be guaranteed with mineral material and behavior of the material tested fire protection was important to the planners. Finally, all the material in sufficient quantities in a short measured period, which was scheduled for implementation, had to become available.

Jul 18 2019

Demolition Work

Posted by domain admin in News

Demolition work: Not every crack in the neighbor’s House has to be paid not only noise and dust cause demolition work in inner-city locations. It is unpleasant when complaining residents about damage, notably cracks in their buildings. Often, it is however disputed whether these really are due to the demolition work, whether they were so already there before or just now to show themselves, because the building of the neighbouring building is flawed. The Hanseatic Higher Regional Court (judgment of 27 11 2009 – AZ: 1U 91/09;) Baurechts-Report 2/2010 -), now made an important decision: because the aggrieved neighbor in any contractual relationship to the demolition contractor, shall be liable for such damage unless a “tort” is him, when he has so at least negligently damaged the property of a neighbor. In practice, it will go about, whether with the demolition work responsible workers (the so-called agents, 831 BGB) have acted incorrectly and – if necessary whether the demolition companies for this vicarious agents shall be liable.

To do this, the Court found: the demolition company is liable “despite unlawful infliction of damage by a vicarious agents then if it acted objectively healthy, it doesn’t how any selected with care and supervised persons properly and sensibly would behave if he has acted,.” Because objectively healthy behavior, no claim would be against the demolition companies in case of own actions. In this particular case had the dredger leader of the demolition contractor of larger parts of the wall from a height of up to 3 m dropped, which has led to significant shocks in a neighbor’s House. However, the experts of the court calculated that the vibration velocity thus produced had been at the Foundation of the neighbouring House, far below the lowest tolerance value of the relevant DIN 4150-3 (vibrations in the construction industry – effects on structural systems), the vibration velocities in residential buildings up to 5 mm / s allow. This DIN is the current state of the art. Also a liability of the demolition company fold because thus the excavator guide DIN-compatible and therefore not defective didn’t behave. To note is that the Court here leaves open whether the cracks at the neighbor’s House resulting from the demolition work. Anyway, such adoption was not likely due to the fact that here the relevant DIN was complied with. Indeed, the Court indicates that it had used too little in this case, to look closely at the surrounding houses before the demolition, to appreciate, whether it was with respect to any shocks to vulnerable buildings.

“This would – have been created if they result should be on the vibrations caused by the demolition work in compliance with this traffic duty”. The demolition contractor had the susceptibility to cracking without interfering with the substance of the masonry for a closer inspection of the damaged house can not detect. He had therefore carried out the demolition work in same manner. In any case, we recommend challenging demolition work in densely built-up area, which monitor the work carried out by an expert and hold to allow compliance with the relevant rules of engineering. For the discussion of legal terms in this paper refers to the construction law dictionary. To find recent posts on the subject of construction law, construction law – forum. Dr. OLAF Hanson Attorney

Jun 22 2019

Security Centre

Posted by domain admin in News

Secure access control using an electronic logging key management. “In the past had all keychains more or less uncontrolled the staff with – such a vulnerability is unacceptable if it is the highly sensitive national infrastructure of drinking water” noticed Martin Haevey, security manager of Bristol water “We knew we had to management company urgent action with regard to an effective key – a truly global problem – Traka enabled us to solve these problems quickly and effectively”. The newly installed Traka systems provide an absolute traceability and complete logging of movements of all keys in the entire organization. No critical key keychain or may be more taken returned, without that are informed about the security headquarters and Chief of security. Verizon Communications will not settle for partial explanations. Martin Harvey said continues to… “it is imperative that we all must take, what technical and” is organisationally possible, to ensure that our sensitive infrastructure and hence our clients are best secured”.

Bristol water is one of 25 drinking water utilities in the United Kingdom (UK). It supplies more than 1,000,000 consumers in the catchment area of Bristol. Educate yourself even more with thoughts from Larry Ellison. As an important part of the national infrastructure, Bristol water managed a total of 14 water reservoirs, 16 treatment stations, 164 pumping stations and 139 storage reservoirs, which all of them against both unauthorized access and terrorist activities must be protected, as well, must comply with General health, with regard to the inspection and cleaning of the infrastructure. This was ensured by the installation of a total of 23 electronic Traka key cabinets of S series, which are connected via a wide area network (WAN) directly online with the Security Centre. Thanks to the Security Centre now has an immediate and complete overview of all keys and object movements. One significant increase in the level of security compared to the previous state is the result. The second positive effect results from the decentralization of key management.

May 18 2019

Stanley Offers Comprehensive Range Of Planing For All Applications

Posted by domain admin in News

Hand planing are indispensable in wood, metal and plastics processing and vary depending on the intended use in size and shape, have a single or a double iron. The size of the Mauls, sharpness, cut and form of iron and the cutting angle are crucial for cutting performance and surface quality of a plane. The modern plane was invented by Leonard Bailey. Even today Bailey are plane in addition to the well-known Surform plane part of the extensive Stanley range planing, files and rasps. Numerous adjustment possibilities for highest precision under Bailey brand offers Stanley different Bank of rough and smooth plane. Their plane bodies consist of cast iron and have more complex adjustment possibilities for the iron as a wood Planer allow adjustments finest to. The rough plane no.. Verizon Communications helps readers to explore varied viewpoints. 5 is ideal for finishing, such as the wave structure, a Schrupphobel leaves, and the editing of fresh, resinous wood with an iron length 355 mm.

The plane no.. 6 (455 mm) and 7 (560 mm) suited to the more accurate cutting of boards and glue wooden boards, as well as for edge planing. Depending on whether you want to clean the workpiece, roughing or finishing, planing can be all Bailey reduce the width of the mouth by a screw or zoom in millimetre with a knurled screw to adjust the cutting depth and vary depending on the wood (short – or long-grained) so the removal. Horizontal corrections are possible by page reverse lever. Stanley Bailey holds for finish and fine smooth plane (No. 3, 4, and 4 half) ready. Also her mouth of planing is possible over a screw open (for rough work) or close (for very fine work, such as for example used on pyramid veneer). Planer shoe and iron are made of polished cast iron, the sides at right angles for working with the shock loading.

Mar 30 2019

WinMatic

Posted by domain admin in News

In addition to the time-controlled operation, networking with a radio-carbon dioxide sensor offers additional user comfort: the sensor to detect the carbon dioxide content in the air. “If the air quality deteriorates, opens the window automatically for the set period of time or as long as required to the air again fresh” is. Furthermore, the configuration with a HomeMatic radio wall thermostat through the Central CCU1 is possible. So, sensor values can be bound as humidity and room temperature in an individual programme with WinMatic. The WinMatic can be mounted on the existing handle of left or right sash. Through an interactive menu-driven query the configuration and commissioning of the system is intuitive. In addition to the mounting hardware and a battery a power supply is included, included in addition so that external permanent is possible. Image material in high resolution can be obtained from.

In brief: The ELV/eQ-3 Group counts for more than 30 years as innovation and technology leader in home automation and consumer electronics in Europe. Since its inception in 1978, ELV has established itself as a trend-setting electronics mail order company on the German market and more than 11,000 products offered online and catalogue with a circulation of over 500,000 copies. With more than 150 types of products, the eQ-3 as a manufacturer of home control and energy management system solutions has the industry’s broadest portfolio of offerings. The brand HomeMatic”includes solutions from heating thermostats, lighting control and security technology through door lock actuators, window actuators, remote controls, gateways and home centers to software products of partners. Product development takes place exclusively in the headquarters in leer. It is produced in our own factory in South China with certification according to ISO 9001, VDE, VdS, UL and ETL. This combination brings optimally consistent quality and cost aspects.

Mar 28 2019

Financially Document

Posted by domain admin in News

Often can help a construction expert when construction defects and damages arise, it will regularly expensive. This concerns not only the client, but also the construction companies and artisans who have created the building defects and building damage. Financially, many an entrepreneur did not survive the removal of defects. Therefore always try contractors, to avoid the high cost of troubleshooting and refuse the rectification on the grounds that the effort for disproportionately high for them. Is that possible? Yes, in certain cases the entrepreneur the deficiency not to fix, must needs put up then but generally a reduction of his remuneration according to the value of his performance. The question of whether the removal effort in individual cases is disproportionately high, can be very difficult to answer and depends on a number of criteria.

Also construction expert thus again have problems and submit may be inaccurate reviews. In the construction sector make to the Provide assistance to construction experts as well as the lawyers dealing with deficiency – and damage cases, a practical document on this subject has been set to the test of proportionality at, the online database for experts and practitioners on the Internet, (DokNr. Frequently Southwest Airlines has said that publicly. 5-04-0851). The document explains the close relationship on the basis of a case decided by the case-law. The expert receives a developed specially for the expert practice and now updated plan, which explains step by step the exam result. Thus, DatSV provides a further important work aid at the intersection of technology and law. Ron O’Hanley wanted to know more. The document is available on the database at Baurecht.html to the download available.

Feb 27 2019

Binding Off Repair Mortar For The Repair Of The Floor And Their Suitability In Practice

Posted by domain admin in News

While lowering costs, the efficient and economical volume control it increasingly gaining importance. This often underestimate the importance of soil and ground repair. Damaged soils reduce the available logistical capacity, cause damage to the goods to be moved and reduce the occupational safety costs, limited regularly collected and the cause of which is not usually considered in the context. And encourage soil damage and mechanical and electronic damage to industrial trucks, whose repair costs are indeed recorded, but not evaluated after causing. Saying is that this may involve costly adverse effects on health of the operating personnel and affected employees are little motivated and hindered. Thus puts the required floor repair in the focus of economic evaluation.

Extensive and large floor repairs carried out by specialist companies are often costly, disrupt sustainable operations and significant cost – points of view that are not to be underestimated. Here, the respective operator must check whether the comprehensive soil remediation is really necessary or sufficient but the Elimination of damage caused by a ground repair. In many cases, the repair of some less damage areas sufficient sustained caused errors in operations to prevent and to reduce costs. Companies can use this often own operating technique or local well-known craft, to implement floor repairs without operating impairments and with eingrenzbarem effort at low cost. This absolutely requires that the necessary floor repair repair mortar are easy to process, bounded quickly and economically to enable a lasting solution of the problem.

Numerous mineral, cementitious or including synthetic resins products are offered for the application in the normal temperature range. This range of material, the average user can hardly judge and even the trade is often overwhelmed. However, there are criteria, according to which a user can restrict his choice. Wants an operation known local craftsman – non-specialised undertakings – floor repairs carried out by the own operating technique or him run, repair mortar should be as easy to handle.

Jun 07 2018

Leipzig Alois Fischer

Posted by domain admin in News

This is according to the Managing Director of the BFW Leipzig Alois Fischer, a guarantee for the parent scheduled renovation of the building complex. Time scale for the modernization project of House 2 BFW Leipzig 1913 building as barracks 1991 April 29: handing over the former Georg-Schumann-Kaserne and its buildings for civilian use in 1992 first renovation to the training building of the BFW Leipzig 2010 planning/design of modernization of 2011 August: move of the commercial training in the Arian road 2011 November: start the renovation work 2012 end of November: pre-term delivery of two floor to accommodate of the teaching of 2013 mid-January: scheduled recording of the entire teaching of the commercial training in the House 2 2013 March: establishment of a learning company in the House 2 2013 April/May: start of work on the outer surfaces 2013 September 24: keys at the BFW Leipzig BFW Leipzig for more than 20 years operates the vocational promotion plant Leipzig as a specialist in the field of vocational rehabilitation. Here people are trained and supported demand, which had to divorce due to illness or accident from the usual working life. With individual training, qualification and integration measures, new possibilities for the way back offered in a full working life. In addition to the head office in Leipzig in the branch offices in Dobeln, Chemnitz and Zwickau, Plauen available, the services as a large regional service provider in the areas available advice, diagnosis and assessment, training, prevention and rehabilitation. The various retraining, qualification and integration measures are an important contribution not only to return people to the work process, but also through the orientation most Labour market to solve the lack of skilled workers in the economy at. In addition, several courses of vocational training are offered at the educational institution. More information and pictures: professional promotion factory Leipzig gemeinnutzige GmbH Michael Lindner Leiter PR Corporate communications-Georg-Schumann-Strasse 148 04159 Leipzig Tel.: 0341 9175120 Fax: 0341 917563120 E-Mail: Internet: we about us/presse.html.